Projects

When a construction company invests in a variety of projects, the combination can be viewed as a portfolio of projects. Such a great portfolio.

First Dhaka Elevated Expressway


Innova & MEP Engineers Limited worked as MEP Solution provider including Fire Detection & Protection System, Sanitary & Plumbing solution, Water Management System,

Read more

Coca-Cola-Bangladesh Beverages Pvt. Ltd.


IPBL production and process area Central HVAC System Design & Construction; Comprised of AHU, Chilled Water Pumps, Sheet Metal Ducting, Metering Devices & Electrical Control System.

Read more

Arla Foods Bangladesh Ltd.


Ice water production, Air conditioning system for powder filling, power handling, UHT filling, Powder dumping, Ventilation system, Process piping.

Read more

The Peninsula Chittagong Airport Garden


The Peninsula Chittagong Airport Garden Central Hot Water Generation System; Comprised of Heat Pump with accessories, Heat Pump Mixing Tank, Hot Water Pumps, Plate Heat Exchangers, Piping, Electrical Control System etc.

Read more

Enargon Renewables (BD) Limited


Solar Module Cleaning System Design & Construction; was completed on January 2022

Read more

Orion Power Rupsha Ltd.


Power Plant Ventilation & Air condition System Design & Construction; Fire Detection & Protection System Design & Construction; was completed on July 2020

Read more

Orion Power Sonargaon Ltd. (OPSL)


OPSL Plant Ventilation & Air condition System Design & Construction; Fire Detection & Protection System Design & Construction; was completed on July 2020

Read more

Orion Pharma Ltd.


Orion Pharma Ltd. Narayanganj Production Facility Steam Distribution System Design & Construction; Fire Hydrant System Design & Construction.

Read more

Nutan Bidyut (Bangladesh) Ltd.


NBBL Powerplant Ventilation & Air Conditioning System Design & Construction. The Project was completed on November 2021

Read more

Olympic Industries Limited


Olympic Industries, Madanpur packaging unit Steam generation & Distribution System Design & Construction; was completed on December 2018.

Read more

MadhuMoti Power Plant


MadhuMoti Power Plant Ventilation System Design & Construction; was completed on July 2019.

Read more

Rooppur Nuclear Power Plant


Rooppur Nuclear Power Plant Zone 18 Fire Protection Equipment Supply Contract; completed on December 2020.

Read more

Evercare Hospital Chattogram


Evercare Hospital Chattogram Hot Water Generation System Design & Construction. The project was a sub-contract under Modern Erection Ltd. and was completed on July 2021.

Read more

Amann Bangladesh Ltd.


Amann Factory Building Central HVAC System Design & Construction; Comprised of Air Cooled Chiller, Chilled Water Pumps, Chemical Dosing Plant, Fan Coil Units, Valves & Accessories and Electrical Control System.

Read more

Brandix Apparel Bangladesh Ltd.


Brandix Production Facility Air Conditioning & Fire Detection and Protection Systems Design & Construction; Steam, Compressed Air & Power Generation Systems Design & Construction; Water Distribution & Sewerage Systems Design & Construction

Read more

Bangladesh Air Force Base Zahurul Haque


BAF base Zahurul Haque Hanger Air Conditioning System Design & Construction. Innova & MEP Engineers Ltd. has been working as a subcontractor under Astron Enterprise.

Read more

Nestle Bangladesh Ltd.


Nestle Bangladesh Ltd. Packaging Facility Ventilation System Design & Construction. The project was completed on January 2022.

Read more

Notice: Trying to access array offset on value of type bool in /home/innovame/public_html/wp-content/plugins/hybrid-composer/global-content.php on line 270

Notice: Trying to access array offset on value of type bool in /home/innovame/public_html/wp-content/plugins/hybrid-composer/global-content.php on line 273

M.N. Dyeing, Printing & Washing Mills Ltd.


Interdum iusto pulvinar consequuntur augue Purus exp laboris nisi ut aliquip ex ea commodo consequate.

Read more